Time:2023-03-25 source:Industry News Popular:display shelving wholesaler Views:525

The loft platform needs a lot of effort in the installation process because of its many parts and complex structure. Ningda summarized some key points of loft platform installation, which can simplify the complex procedures of loft platform installation.
1: Lighting. The lighting lamp is an essential equipment for the attic platform. In the installation, the position of the lighting lamp should be adjusted properly so as not to leave a dead corner in the attic. If the position of the lighting lamp on the drawing cannot cover the attic platform, the installation personnel should manually adjust the position of the lighting lamp. After the installation of the loft platform, the installation of all the shelves should be completed.
2: Stairs. In order to facilitate the installation of the attic platform, installing the attic stairs first can reduce the cost of installation time. It is suggested that the movable stairs can be installed first. For welding and fixing the stairs, the loft platform can be installed only after the installation is completed. To avoid the deviation of the passage distance, the stairs cannot be installed normally.
3: Laminated shelves in the attic. The attic platform will not be stored separately. Generally, in the storage environment, the upper layer of the attic platform will be equipped with laminated shelves for use. The installation of the laminated shelf can only be carried out after the completion of the loft planking and welding.
4: Structural positioning. The positioning of the attic platform is basic and needs to be carried out step by step. Blank space shall be reserved according to the actual situation in structure positioning. Similar to the through shelf, install the column first, and then graft the beam. Or alternatively, one column and one beam.
5: Chemical bolts are stable. After the column beam is installed, chemical bolts shall be used for drilling immediately. After the chemical bolts are punched, it is necessary to wait about 10 minutes before installing the attic platform parts.
6: Planking installation. The installation of planking is relatively easy. After installation, multi-point welding is required to ensure that the laminate will not produce friction or movement sound after being squeezed. During installation, the installation personnel need to continuously debug.
7: Installation of attic floor parts. The parts at the bottom of the attic are usually installed after the overall structure of the attic is completed, and can also be adjusted by itself.
Read recommendations:
3-Tier TV Stand with Wood Top / TV Console Table With Open Storage Shelves on Wheels For Living Room
Why is the finishing industry becoming more and more popular in China?
Last article:Storage shelves: "buffer" center of cargo circulation.heavy duty metal garage shelving
Next article:Daily maintenance and maintenance of warehousing shelves.for living 4-tier chrome wire shelf
Popular Recommended Products
5-Tier Chrome Wire Warehouse Shelving / Storage Shelving Units / Steel Organizer Wire Rack Chrome
2022-11-09Wire Shelving Unit / Steel Organizer Wire Rack Chrome / Custom Steel Wire Racks
2022-11-29MZG Wire Storage Shelving 3-Tier, Chrome
2023-10-25MZG Steel Storage Shelving 5-Tier with Wheels, Black
2023-10-251-Tier Washing Machine Storage Rack with Hanging Rod and basket
2022-11-23Installation method of attic storage shelves
2022-12-08storage shelving unit with doors.Essential Details of Heavy Duty Shelf Management
2024-02-27for living 4-tier chrome wire shelf.How to design the shelves of a three-dimensional warehouse
2023-11-02Provisions on the Safety Management of Warehoused Goods
2022-12-09Features of shelves
2022-12-154-tier metal utility rolling cart price
2023-04-12wire storage rack with baskets
2023-03-25wire closet shelf installation
2023-03-25wire kitchen/pantry shelving distributors
2023-04-12