Time:2023-03-25 source:Industry News Popular:display shelving wholesaler Views:525
The loft platform needs a lot of effort in the installation process because of its many parts and complex structure. Ningda summarized some key points of loft platform installation, which can simplify the complex procedures of loft platform installation.
1: Lighting. The lighting lamp is an essential equipment for the attic platform. In the installation, the position of the lighting lamp should be adjusted properly so as not to leave a dead corner in the attic. If the position of the lighting lamp on the drawing cannot cover the attic platform, the installation personnel should manually adjust the position of the lighting lamp. After the installation of the loft platform, the installation of all the shelves should be completed.
2: Stairs. In order to facilitate the installation of the attic platform, installing the attic stairs first can reduce the cost of installation time. It is suggested that the movable stairs can be installed first. For welding and fixing the stairs, the loft platform can be installed only after the installation is completed. To avoid the deviation of the passage distance, the stairs cannot be installed normally.
3: Laminated shelves in the attic. The attic platform will not be stored separately. Generally, in the storage environment, the upper layer of the attic platform will be equipped with laminated shelves for use. The installation of the laminated shelf can only be carried out after the completion of the loft planking and welding.
4: Structural positioning. The positioning of the attic platform is basic and needs to be carried out step by step. Blank space shall be reserved according to the actual situation in structure positioning. Similar to the through shelf, install the column first, and then graft the beam. Or alternatively, one column and one beam.
5: Chemical bolts are stable. After the column beam is installed, chemical bolts shall be used for drilling immediately. After the chemical bolts are punched, it is necessary to wait about 10 minutes before installing the attic platform parts.
6: Planking installation. The installation of planking is relatively easy. After installation, multi-point welding is required to ensure that the laminate will not produce friction or movement sound after being squeezed. During installation, the installation personnel need to continuously debug.
7: Installation of attic floor parts. The parts at the bottom of the attic are usually installed after the overall structure of the attic is completed, and can also be adjusted by itself.
Read recommendations:
4-Tier Garage Wire Shelf / NSF Chrome Wire Shelf / Heavy Duty Metal Garage Shelving Unit
4-tier metal utility rolling cart
4 tier metal bookself.How to Design a Storage Shelf System Correctly and What to Pay Attention to
Last article:Storage shelves: "buffer" center of cargo circulation.heavy duty metal garage shelving
Next article:Daily maintenance and maintenance of warehousing shelves.for living 4-tier chrome wire shelf
Popular Recommended Products
4-Tier Bookshelf / Book Storage Rack / Adjustable Book Case
2022-11-194-Tier Wire Shelving Unit / Steel Organizer Wire Rack / Expandable Wire Storage Rack
2022-11-1011-Tier Metal TV Stand for 42 inch TV / Entertainment Center / TV Console Table With Open Storage Sh
2022-11-155-Tier Book Shelf / book storage rack / adjustable book case
2022-11-15kitchen baker's rack maker
2022-11-16Three key points to pay attention to when customizing storage shelves
2024-09-09How to place supermarket shelves
2022-12-12adjustable steel shelf factory.How to Ensure High Quality Heavy Duty Shelves
2023-11-284-shelf wire storage rack company.Customized requirements for heavy-duty shelves in warehouses
2024-07-042020-04-05 Won the honor of "Assessment of the Integration of Industrialization and Industriali
2023-03-065-shelf wire storage rack sales
2023-03-24book storage rack company
2023-03-242 tier steel wire shelf Manufacturing
2023-03-24white metal garage shelving Vendor
2023-03-25