What should I prepare for the early stage of automation three -dimensional warehouse?wire shelving units on wheels maker

Time:2023-04-20 source:other news Popular:display shelving wholesaler Views:710

  

  In the early days of the establishment of an automated three -dimensional warehouse, enterprises need to have a clear cognition and planning of these factors. Once the automated three -dimensional warehouse project is built, it may cost a lot of cost.

  1. Inventory capacity: The shelf learns that the capacity of the three -dimensional warehouse, including all the total amount of items in the three -dimensional warehouse that needs to be stored and temporarily existing;

  2. System work ability: the ability of the three -dimensional warehouse logistics system (throughput) out of the warehouse, warehouse and operation;

  3. Information processing: the ability to process information processing, including information collection, information processing, information inquiry, information communication, and even business information processing;

  4. Peripheral logistics processing: How to unload the cargo, inspect, set the plate, and transport it to the lane entrance of high -rise shelves, remove the cargo from the high -rise shelves, disassemble the plate, merge, pick, carry, loading, etc.

  5. Human -machine connection capabilities: the connection between the operator and the system, the human -machine interface, the information entry, the processing of the inspection of unqualified products, and entering the automatic movement line, etc.;

  6. Functional requirements: storage, warehouse, handling, information processing, personnel operation and maintenance, etc.;

  7. Requirement of the degree of automation: manual, semi -automatic, fully automatic;

  8. Auxiliary requirements: video surveillance, temperature and humidity measurement and control, access control, manual transportation vehicles, etc.;

  9. Boundary conditions: venue conditions (long, wide, higher), power supply, ground foundation, etc.;

  10. Working period: experience the development, inspection, packaging, transportation, on -site installation, commissioning, acceptance and training of software development, inspection, packaging, transportation, on -site installation, acceptance, and training of software such as design, procurement, manufacturing, processing, assembly, control and management. quality;


Read recommendations:

3 Tier Wire Closet Shelf Organizer With Hanging Rod / Freestanding Open Wardrobe Organizer

5 shelf wire storage rack

What are the daily maintenance methods for storage shelves.wire storage rack kitchen

Last article:What are the advantages of heavy storage shelves?wire shelving units on wheels company

Next article:Basic operating process of shallow analysis automation three -dimensional warehouse.wire shelving un

Popular Recommended Products

Shenzhen Meizhigao Technology Company Limited. Shenzhen Meizhigao Technology Company Limited.

Shenzhen Meizhigao Technology Company Limited.

Shenzhen Meizhigao Technology Company Limited.