1. Fire separation measures should be taken between the loading and unloading (sorting) operation area and the storage area, and the structural stress system of the loading and unloading (sorting) operation area and the storage area should be relatively independent to ensure that there is no overall collapse in the event of a fire; The maximum allowable building area of the fire compartment in the loading and unloading (sorting) operation area can be determined by referring to Table 3.3.1 of the current national standard "Code for Fire Protection Design of Buildings" GB 50016-2006 for Class C factory buildings; The maximum allowable floor area of the storage area and the maximum allowable building area of the fire compartment can be determined in accordance with the provisions of Note 4 in Table 3.3.2 of the current national standard "Code for Fire Protection Design of Buildings".
The fire resistance rating of the logistics distribution center building should not be lower than level two. The logistics distribution center for steel structured shelves should use reinforced concrete columns, or steel columns should be coated with fire-resistant materials, or a combination of coatings and fire-resistant materials can be used to achieve the corresponding fire resistance limit specified in the specifications.
3. The number and width of safety exits, evacuation distance, and evacuation stairs in the loading and unloading (sorting) operation area and storage area should respectively comply with the relevant regulations of Class C factory buildings and warehouses in the current Code for Fire Protection Design of Buildings.
4. The loading and unloading (sorting) operation area and storage area should be equipped with automatic fire extinguishing systems, automatic alarm systems, and smoke exhaust facilities in accordance with the current national standard "Code for Fire Protection Design of Buildings".
5. The shelf building of the logistics distribution center should be equipped with a circular fire lane, and a fire fighting surface should be arranged within at least 1/4 of the length of the long side or the surrounding area, and not less than one long side length range. A staircase or entrance that leads directly to the outside should be set up within the fire fighting surface range, and there should be at least 15-18m of open space on one side of the fire fighting surface that can carry out fire operations.
Read recommendations:
3-Tier Wire Storage Racks For Pantry / Steel Organizer Wire Rack / Utility Shelving Unit
Last article:4 tier steel wire shelf custom.Can warehouse shelves really improve the quality of warehouse managem
Next article:5 forms of low-temperature storage facilities
Popular Recommended Products
3-Tier Washing Machine Storage Rack with Hanging Rods and Hooks
2022-11-232-Tier Wire Metal Shelving For Living Room / Metal Display Shelving / Metal End Tables Bathroom
2022-11-0812-Tier Bookshelf / Workstation Computer Desk With Wire Storage Shelves / Home Office PC Laptop Tabl
2022-11-155 shelf wire storage rack supplier
2022-11-16cabinet organizer and storage shelves manufacturer
2022-11-19Multi -layer shelves for shallow analysis of storage.wire storage rack kitchen maker
2023-04-21Daily maintenance and maintenance of warehousing shelves.for living 4-tier chrome wire shelf
2023-03-28The difference between lightweight shelves and medium-sized shelves
2024-09-10How to use an intelligent warehousing system correctly
2023-10-07Summary of influencing factors on the production quality standards of heavy-duty shelves.counter top
2024-07-165 shelf wire storage rack sales
2023-03-253 tier wire shelving unit sales
2023-04-12metal bathroom shelves freestanding
2023-03-25white metal bathroom shelves Processing
2023-04-12