How many steps are required for the design and planning of an automated three-dimensional library?
At present, automated vertical warehouses have become an important component of modern logistics systems in the market. They use vertical warehouse equipment to achieve high-level rationalization, automated storage and retrieval, and simplified operation. So, how many steps are needed in designing and planning automated vertical warehouses? Let's learn together below.
1、 Determine the demand for automated stereoscopic library
1. To determine the requirements for an automated three-dimensional warehouse, including information on material types, quantities, sizes, weights, packaging forms, as well as requirements for warehouse area, height, temperature, humidity, control systems, etc.
2. According to the actual situation, the optimal capacity of the automated stereo library should be calculated in order to consider sufficient space during design.
3. We need to consider the security of automated stereoscopic warehouses to ensure the safe storage and transportation of goods.
2、 Design of Automated Stereoscopic Library
1. According to the requirements of the automated three-dimensional warehouse, design the shelf structure, determine the height, width, depth, support structure, support materials, assembly method, etc. for shelf customization.
2. Design a control system for an automated stereoscopic library, including control equipment, sensors, control programs, software, etc.
3. To design transportation equipment for automated three-dimensional warehouses, including shelving trucks, shelving elevators, automatic shelving mobile machinery, etc
4. Design the operation process of automated three-dimensional warehouse, including inbound, outbound, query, inventory management, etc.
3、 Implementation of Automated Stereoscopic Library
1. Purchase equipment, including control devices, sensors, shelf trucks, shelf lifts, automatic shelf moving machinery, etc.
2. Install equipment, install shelves according to design drawings, install control equipment, sensors, shelf trucks, shelf lifts, automatic shelf moving machinery, etc.
3. To check the equipment, ensure that it is installed correctly, and conduct system debugging to ensure the normal operation of the equipment.
4. Training and demonstrations should be conducted to ensure that operators can correctly operate the automated stereo library and promptly detect and handle faults.
Read recommendations:
5-Tier Warehouse Storage Wire Shelf / Heavy Duty Metal Garage Shelving Unit
8 ft wire closet shelf company
The structure advantage of the attic shelf!stainless steel wire shelf rack
Last article:How can the design of heavy-duty shelves in factories cater to product warehouses?wire kitchen/pantr
Next article:Cabinet Shelf Organizer Storage Rack Factory
Popular Recommended Products
5-Tier Metal Storage Garage Shelving / Metal Garage Wire Rack
2022-11-154-Tier Display shelving / Metal Wire Shelving Unit / Storage Rack Shelving Unit
2022-11-153-Tier Bookshelf / Book Storage Rack / Adjustable Book Case
2022-11-15Chrome Wire Shelving Unit / Storage Racks for Medical Industry / Rolling Trolley Cart / 18 x 48 NSF
2022-11-293 Tier Wire Closet Shelf Organizer With Hanging Rod / Freestanding Open Wardrobe Organizer
2021-05-31Organize storage, an unexpected new home furnishing industry is quietly emerging!
2021-05-31counter top rack shelf.How to choose a suitable supermarket shelf?
2024-06-21steel organizer wire rack chrome.Shelf remind you how to buy a shelf system that makes you rest assu
2024-03-12What should we pay attention to when customizing shelves?
2022-12-13How is the storage shelves structure designed?
2022-12-084 tier wire shelving unit Processing
2023-04-123 tier metal bookself Factory
2023-04-12kitchen storage shelving unit wholesale
2023-04-12steel wire shelf 84 Vendor
2023-03-24